Old pressure vessel (1311 views)
Mr. Armstrong briefed the board on recently discovered leaks in the pressure tank at the Bellevue plant.  The pressure tank has been temporarily repaired, but is no longer considered safe.  The pressure vessel is designed to hold thousands of gallons water and with the aid of an air compressor it maintains enough pressure to sustain the northwest area of the Village Water system.  Due to its age and weakened physical state, the tank could literally explode resulting in significant damage.  The work will require removal of the tank and includes the installation of two variable frequency drives to maintain the pressure in the area.  It wil also include two new booster pumps.
December 16, 2011
Old pressure vessel repair (1523 views)
Due to its age and weakened physical state, the tank could literally explode resulting in significant damage to the plant and any personnel in the immediate vicinity.
December 16, 2011
New Variable frequency drives (1400 views)
Mr. Armstrong, Mr. Bardett and Mr. Fayad all felt that this situation requires immediate action to remove the pressure tank.   Due to safety considerations, Mr. Bardett authorized Mr. Fayad to seek bids for the removal of the pressure tank.  The work required to remove tank includes two variable frequency drives to maintain the pressure in the system.
December 16, 2011
New Generators (1430 views)

Upgrades to include Generators, Electrical Modifications and monitoring equipment.  Mr. Thornton moved to acquire two generators, two propane tanks and the necessary electrical modifications.  Seconded by Mr. France.  Approved unanimously.


December 16, 2011
New Generators (1405 views)
Upgrades to include electrical modifications. Modifications started at the source of power with new transformers to new electrical service into the plant.  A new "step down transformer" which allowed the removal of a electrical service meter.
December 16, 2011
New Generators (1414 views)

Upgrades to include Generators, Electrical Modifications and monitoring equipment.  Mr. Thornton moved to acquire two generators, two propane tanks and the necessary electrical modifications.  Seconded by Mr. France.  Approved unanimously.


December 16, 2011
Remote site (1409 views)
Remote well site generator
September 12, 2013
New tank (1312 views)
The new tank at Bellevue Road will increase storage and replace an old worn out tank and Hwy 80 will add an additional storage tank. 
October 21, 2013